Shaoxing Line 2 opens
Today, Shaoxing Metro Line 2 Phase I officially opened for operation, which is since the end of April last year, Shaoxing Metro Line 1 opened for operation, Huaqi intelligent passenger information system again for the people of Shaoxing.
The opening of the shaoxing metro line 2 phase 1 project is 10.8 kilometres long, set up 9 stations, all underground stations, starting from the mirror lake hospital station, the end of the sandalwood station, laying along the Yangjiang Road. Shaoxing line 2 a project and line 1 to form a Y-type backbone network, in the Meishan Square station interchange, open the Shaoxing metro "network operation, double line interchange" the development of a new chapter.
Huaqi PIS INSIDE
Line 2 Phase I is the first fully automatic operation line of Shaoxing Metro, which is constructed according to GoA4 (automatic operation of trains under unattended operation), the highest level of fully automatic operation standard, and can realise a number of fully automatic driving functions.
In order to adapt to the characteristics of fully automatic driving, the train passenger information system provided by Suzhou Huaqi has added a number of new functions: it can be linked with the OCC centre, support the control centre broadcast and text sending, control centre and passenger emergency intercom; alarm linkage after opening the escape door; hot standby redundancy of main and standby centres, when the main centre is cut off, the secondary centre can still be used normally.
Fortunate to become a new map of Shaoxing metro light up the pro-life, witness, Huaqi intelligent and have the honour. In the future, we will make unremitting efforts for Shaoxing's urban rail transport construction, for the "rail on the Yangtze River Delta" continue to add bricks and mortar, contribute to the modest contribution.
Copyright ® 中国·太阳成集团-www.tyc234cc|主页网址 版权所有 苏ICP备15006498号